Seconded
2025-08-18
passed
“Susan Buse made a motion to approve with the following conditions: 1) The applicant shall contribute to the city forestry fund compensatory with the requirements of Section 405.4110.C.2. 2) To ensure the future maintenance and operation of the dry-well and ribbon drive, the applicant shall record a deed restriction noting the location and maintenance requirements of the dry-well system and the ribbon drive and shall submit proof of the recording prior to issuance of a Building Permit. 3) The applicant shall provide a percolation test report conducted by a qualified geotechnical engineer. The report must assess the performance of the proposed drywell based on the anticipated impact of a 15-year, 20-minute storm event. Should the results indicate that the proposed drywell is insufficient to accommodate the stormwater runoff generated by this event, the applicant shall be required to upsize the drywell accordingly to ensure adequate performance and compliance with applicable stormwater management standards”