Citation in context
January 20, 2026 — Meeting Minutes
Cited passage
Section 405.4110.C.2.A. Susan Buse seconded the motion. The motion carried unanimously.
2. 8145 University Drive - Architectural Review Board - New Residential (00:35:07) Consideration of a request by Linda Clark, Applicant, on behalf of MRM Manlin Development Group, Owner, for review of design and materials of a new single-family house.
Ryan Helle provided a summary of the staff report with a recommendation to approve as submitted. Jamie Hudson, Linda Clark, and Mike Thompson were present on behalf of the application. The PC- ARB discussed the application with the project representatives. Helen DiFate made a motion to approve as submitted. Susan Buse seconded the motion. The motion carried unanimously.
DISCUSSION SESSION
conducted by a qualified geotechnical engineer prior to approval of a building permit. a. The report must assess the performance of the proposed flo-well based on the anticipated impact of a 15-year, 20-minute storm event. Should the results indicate that the proposed flo-well is insufficient to accommodate the stormwater runoff generated by this event, the applicant shall be required to upsize the drywell accordingly to ensure adequate performance and compliance with applicable stormwater management standards. b. The report must assess the whether the proposed flo-well system can infiltrate stormwater as intended without interference from groundwater conditions. Should the results indicate that groundwater elevation or soil conditions compromise flo-well performance, the applicant shall revise the stormwater management design accordingly.
c. The report must assess basement groundwater conditions and the proposed sump pump system, including whether groundwater would require the sump pump to operate on a continuous or near continuous bases. Should the results indicate groundwater would result in continuous or near continuous operation, then the project shall be revised to mitigate the impact of the continuous discharge.
deed restriction noting the location and maintenance requirements of the well systems and shall submit proof of the recording prior to issuing of a Building Permit.
A discussion of a report of applications reviewed by the Plan Commission and Architectural Review Board for the 2025 calendar year.
Ryan Helle provided a summary of the PC-ARB annual report for 2025. The PC-ARB discussed the report with staff.
V. Adjournment The meeting adjourned at 6:29 p.m.