Citation in context
May 18, 2026 — Meeting Minutes
Cited passage
shall record a deed restriction noting the location and maintenance requirements of the dry-well system and shall submit proof of the recording prior to issuance of a Building Permit. • To approve Architectural Review as submitted. Toni Kaufer and Sandy Schomo were present on behalf of the application. The PC-ARB discussed the applications with the project representatives. Helen DiFate made a motion to approve a three month extension of Site Plan Review with the following conditions:
encroachment of 3 feet. Zachary Roth was present on behalf of the application. The PC-ARB discussed the application with the project representative. Helen DiFate made a motion to continue the application. Jim Arsenault seconded the motion. The motion carried unanimously.
3. 123 North Forsyth Boulevard – Site Plan Review– New Single-Family (00:45:46) Consideration of a request by Toni Kaufer, Applicant/Owner, for extension of a previous Site Plan Review approval
4. 123 North Forsyth Boulevard – Architectural Review – New Single-Family (00:45:46) Consideration of a request by Toni Kaufer, Applicant/Owner, for extension of previous Architectural Review approval.
Items 3 and 4 were considered jointly. Ryan Helle provided a summary of the staff reports with the following recommendations. • To approve a three month extension of Site Plan Review with the following conditions:
geotechnical engineer. The report must assess the performance of the proposed drywell based on the anticipated impact of a 15-year, 20-minute storm event. Should the results indicate that the proposed drywell is insufficient to accommodate the stormwater runoff generated by this event, the applicant shall be required to upsize the drywell accordingly to ensure adequate performance and compliance with applicable stormwater management standards.
geotechnical engineer. The report must assess the performance of the proposed drywell based on the anticipated impact of a 15-year, 20-minute storm event. Should the results indicate that the proposed drywell is insufficient to accommodate the stormwater runoff generated by this event, the applicant shall be required to upsize the drywell accordingly to ensure adequate performance and compliance with applicable stormwater management standards.
shall record a deed restriction noting the location and maintenance requirements of the dry-well system and shall submit proof of the recording prior to issuance of a Building Permit.
Jim Arsenault seconded the motion. The motion carried unanimously. Helen DiFate made a motion to approve a three month extension of Architectural Review as submitted. Jim Arsenault seconded the motion. The motion carried unanimously. V. Adjournment The meeting adjourned at 6:36 p.m.