Citation in context

#qea620c53
facilities_plan 2025-02-19 District website #qea620c53 Open original ↗

Volume1 ClaytonMasterPlan Process Priorities CostEstimations HVAC

This is Volume I of the School District of Clayton Long-Range Facilities Master Plan (2024–2025), delivered to the district in February 2025. The plan includes an introduction, project objectives, master planning process, district priorities and survey results, facility appraisals, cost estimations (including HVAC-specific cost estimates and inventories), building envelope reports, and appendices with cost breakdowns by location and item. Excerpts record assessment scores and comments for classroom and specialized spaces, detailed window/door and room area measurements, and HVAC equipment inventories with installation dates, life expectancies, and replacement priorities. The sampled pages do not show board votes but do list concrete figures (square footage, point values/percent scores, equipment model/serial numbers, and estimated replacement dates).
Cited passage

Thank you Your engagement and feedback are essential as we work to create spaces that support our students, staff, and community. Together, we can ensure our schools remain safe, innovative, and future-ready. 11

Paragon Architecture got its humble start in 2010. Today, our passionate architects and interior designers operate from four locations, delivering flexible design solutions and project management services across Missouri and neighboring states. We proudly partner with school districts, higher education institutions, civic municipalities, businesses, and healthcare providers to address unique challenges with the end users always in mind.

From large-scale master planning and architectural design projects to space reconfiguration and intricate interior designs, our expertise spans projects of every size and scope. As your trusted design partner — and architectural “Sherpa” — we guide you every step of the way, equipping you with tools, insights, and partnerships you need to make informed decisions and navigate every project phase with confidence.

While we are proud to be K-12 master planning specialists and an award-winning architectural and interior design firm, we are defined by more than our services or industry recognition. At Paragon, design is about more than buildings—it’s about people. We cultivate lasting partnerships, advocate for your vision, and strive to positively impact the communities we serve. Together, we’re not just creating spaces—we’re shaping the future of the communities we call home. ABOUT PARAGON ARCHITECTURE PARAGON ARCHITECTURE Springfield | Joplin | St. Louis | Northwest Arkansas www.paragonarchitecture.com | (417)885-0002 SUMMARY FINDINGS: RECOMMENDATIONS FOR NEXT STEPS With the conclusion of the Long-Range Facility Master Planning process, the Paragon team offers these final takeaways: The findings and recommendations align with Clayton’s Strategic Plan, recognizing that today’s learners have evolving needs that are especially different from when the elementary schools were originally built. To maintain Clayton’s status as a premier district both locally and nationally, state- of-the-art facilities are essential. With stable enrollment projections, the district is well-positioned to invest in innovative, and specialized learning environments. Many identified improvements can be addressed within the district’s $4 million annual capital improvement budget, while Level 2 and Level 3 improvement projects may require community support through bond issue election(s). However, before committing to major upgrades, further feasibility studies for three new elementary schools are necessary, including potential property acquisition and continued collaboration with the City. Shaped by the involvement of each building’s committee of stakeholders, as well as extensive overall community engagement, the LRFMP now provides the Board of Education and Superintendent with a comprehensive foundation for determining next steps for the district. 12

Original document