March 6, 2017 — Meeting Minutes
Cited passage
She indicated that the property slopes, so the house is a 2-story in front and a 1-story in back. Samples of the tan brick, architectural shingle roof (charcoal), stucco and cast stone were presented.
3 Joanne Boulton asked what color the grout will be.
Ms. Strutman replied “tan”.
Hearing no further questions or comments, Scott Wilson made a motion to approve as submitted. The motion was seconded by Craig Owens and unanimously approved by the Board.
Chairman Lichtenfeld asked the applicants when they plan to begin construction.
Mr. Sun replied “one month”.
ARCHITECTURAL REVIEW – NEW CONSTRUCTION – DETACHED GARAGE – 8131 WESTMORELAND AVENUE
Tim Shotz, project architect, was in attendance at the meeting. Also in attendance was Anthony Webb, owner.
Susan Istenes explained that the proposed project consists of the construction of an 800-square- foot, 1.5 story detached garage in the rear yard, demolition of the rear brick stair and extension of the concrete driveway. The proposed detached garage will be constructed of building materials matching the existing primary structure on the property. The primary building material will be brick with the secondary building material being Hardie-plank lap siding. The applicant is requesting that the board approve the use of siding above the limit of 25 percent per elevation in order to match the construction of the primary structure. Dark grey asphalt shingles, an over- head black paneled garage door and black casement windows are proposed to match the house. The proposed area above the garage is under a sloped roof, meeting the requirements of a half- story. The proposed project includes removing the exterior rear brick staircase that currently runs from a second story door down to grade. The existing metal guard rail will be salvaged and used to turn the second story doorway into a Juliet balcony. Matching brick will be used to infill any exposure in the rear façade created by the removal of the stairs. The project also includes additional concrete drive pavement and relocation of the trash enclosure. The trash enclosure is proposed on the east side of the house and will be accessed by a paved path from the driveway. Currently, impervious coverage on the site is 66.2 percent, which is above the 55 percent allowed in the R-2 zoning district. The proposed plans reduce the impervious coverage on site to 60 percent. Director Istenes noted that the project as proposed is in conformance with the requirements of the R-2 Single Family Dwelling District and the Architectural Review Guidelines, with the exception of the building material percentage. Staff is of the opinion that the design and materials of the detached garage and exterior renovation are compatible with the home and recommends approval as submitted.
Mr. Shotz asked the Board if they had any questions. He noted one correction to staff’s report; the garage is only 400 square feet.
enclosure.
Landscaping section below for further explanation and staff’s review of the proposed plan.
A site plan depicting those changes was presented.
Chairman Lichtenfeld asked if pattern of water flow has changed since the last proposal.
Mr. Volz replied “no”.
Chairman Lichtenfeld asked about landscaping.
Mr. Volz stated that Bill from Baxter Gardens made changes per the City’s contracted landscape architect (Laurel Harrington) and the minor remaining items will be complied with as well.
Joanne Boulton asked if the three trees in the front are the same.
Ms. Strutman indicated that they are the same species.
Hearing no further questions or comments, Scott Wilson made a motion to approve the site plan per staff recommendation. The motion was seconded by Craig Owens and unanimously approved by the members.
The architectural aspects of the project were now up for review.
Susan Istenes noted that windows have been added to the east elevation and the driveway relocated as noted in the review of the revised site plan. She stated that staff’s recommendation is to approve as revised.
Ms. Strutman presented a color rendering to the members, referencing the 4 additional windows on the east side lower level. She stated that some stucco has been incorporated at the front door; otherwise, the house is all brick. She indicated that the property slopes, so the house is a 2-story in front and a 1-story in back.
Samples of the tan brick, architectural shingle roof (charcoal), stucco and cast stone were presented.
Shotz asked the Board if they had any questions. He noted one correction to staff’s report; the garage is only 400 square feet.
4 Susan Istenes informed the Board that the second floor was included in the square footage.
Joanne Boulton asked if the second floor contained living quarters.
Susan Istenes replied “no, not now”.
Mr. Shotz indicated that there will be a pull down stair to provide access to the second story which will be used for storage.
A sample of the brick that will match existing was presented.
Joanne Boulton asked what color the Hardie Board will be.
Mr. Shotz indicated that the Hardie Board will be brown to match existing.
Joanne Boulton asked when the house was built.
Mr. Webb replied “1941.”
Chairman Lichtenfeld asked if the existing garage will remain.
Mr. Webb indicated that it will be converted to a family room.
Hearing no further questions or comments, Scott Wilson made a motion to approve as submitted. The motion was seconded by Will Liebermann and unanimously approved by the Board.
ARCHITECTURAL REVIEW – NEW CONSTRUCTION – DETACHED GARAGE – 34 RIDGEMOOR
Matt Pevehouse, contractor, was in attendance at the meeting.
Susan Istenes explained that the proposed project consists of the construction of a 910-square-foot, 1.5 story detached garage in the rear yard. The existing 413 square foot detached garage will be demolished as part of the project. The area above the garage is under a sloped roof, meeting the requirements of a half-story. The space will be finished as an office/family room and includes a half bath. Because there are no provisions for cooking or sleeping, it is not considered a second unit. The project also includes additional concrete driveway pavement. The proposed plans increase impervious coverage on the lot to 51 percent, which is still below the maximum 55 percent allowed in the R-2 zoning district. The garage will be constructed of building materials that match the existing primary structure. The primary building material is brick with the secondary building material being stucco with battens. The applicant is requesting that the Board approve the use of stucco above the limit of 25 percent per elevation in order to match the construction of the primary structure. Asphalt shingles, an over-head paneled garage door and
The applicant is requesting that the Board approve the use of stucco above the limit of 25 percent per elevation in order to match the construction of the primary structure. Asphalt shingles, an over-head paneled garage door and
5 white casement windows are also proposed to match the house. Director Istenes stated that the project as proposed is in conformance with the requirements of the R-2 Single Family Dwelling District and the Architectural Review Guidelines, with the exception of material percentage. Staff is of the opinion that the design and materials of the detached garage are compatible with the home and recommends approval as submitted.
Chairman Lichtenfeld asked about material samples.
Mr. Pevehouse stated that he did not bring material samples; however, the brick will match that of the existing front façade of the house and that the stucco will be duplicated. He added that the existing brick on the existing garage will be salvaged.
Hearing no further questions or comments, Josh Corson made a motion to approve as submitted. The motion was seconded by Will Liebermann and unanimously approved by the Board.
SITE PLAN REVIEW/CONDITIONAL USE PERMIT/ARCHITECTURAL REVIEW – NEW CONSTRUCTION – INSTITUTIONAL/RETAIL – 8321 MARYLAND AVENUE
Mark Naylor, project architect, was in attendance at the meeting.
Susan Istenes explained that the subject property is approximately 0.8 acres in size and is located on the north side of Maryland Avenue, between Crandon Drive and Lancaster Drive. The lot is currently used as a surface parking lot and has a zoning designation of C-1 Neighborhood Commercial District and is located in the Maryland Gateway Overlay District. In 2013, a similar project including a drive-through was proposed by 5/3 Bank and was approved. 5/3 Bank never pulled permits or built on the site and sold the property to Regions Bank. The applicant is proposing a redevelopment of the entire site to include a freestanding bank, a remote drive-through associated with the bank, a freestanding retail building and a surface parking lot. The 2,743-square- foot bank building is proposed at the southwest corner of the site, and the 3,457-square-foot retail building is proposed at the southeast corner of the site. The bank and retail buildings will measure 21-feet 6-inches to the top of the parapet. The buildings are built up to the front and side property lines. Over 80 percent of the Maryland Avenue frontage is improved with buildings, and three entrances are proposed along Maryland Avenue. An approximately 1,300-square-foot pedestrian corridor is proposed between the two buildings. City standard streetscape will be installed along Maryland Avenue, Lancaster Drive and Crandon Drive. The 24-space parking lot is located behind the buildings and can be accessed from both Crandon Drive and Lancaster Drive. Vehicles will enter the drive-through via a one-way entrance located in the northeast corner of the parking lot and exit the drive-through at the northwest corner of the parking lot. There are two 9-foot wide drive- through lanes and a 12-foot wide bypass lane that runs parallel to Maryland Avenue. The drive- through will measure approximately 13-feet 8.38-inches to the top of the flat roof and is separated from the site’s parking and drive aisles by a raised curb and landscaped area. According to the applicant, the HVAC will be rooftop mounted with integrated screening. The parapet height will block most sight lines as the equipment will be centralized on the flat roof. Trash will be stored in