LRFMP Board Presentation Feb2025
Accessibility & Inclusiveness • Increase quality of accessibility routes and features. Curriculum & Programming • Increase quantity of flexible spaces, large and small, for daily learner use. • Design outdoor learning and nature spaces. Following the Building-Level Community Forums, design meetings were held for each facility. These meetings included the Paragon team, the facility’s principal, the Chief Financial Officer, and the Superintendent, with the goal of translating community input and district priorities into actionable long-range facility plans. Each design meeting was informed by the outcomes of its respective Building-Level Community Forum and Subcommittee Meetings to ensure the proposed solutions were firmly rooted in student, teacher, principal & community feedback. The Paragon team focused on incorporating High and Medium priority items into the design options and were also able to thoughtfully incorporate lower-priority items where possible. For each facility, 2-3 design long range plans were presented, featuring detailed floor plans and site plans. During these sessions, each decision point was reviewed in depth to allow the district team to provide critical feedback on what would work, what wouldn’t, and what elements were most important to the community. The feedback gathered during these meetings was used to revise and refine the following design options that represent the long-range multi-phase improvements, not necessarily one single step project. Long-Range Facility Master Plan Future Design Options & Improvements Family Center Top Priorities: Multipurpose/Gross Motor Addition Stay-Play-Learn Relocation Classroom Addition / Renovations Site Circulation Secondary Main Entry Playground Renovations Administration Services Restroom Renovations / Additions Level Two
Family Center Top Priorities: Multipurpose/Gross Motor Addition Stay-Play-Learn Relocation Classroom Addition / Renovations Site Circulation Secondary Main Entry Playground Renovations Administration Services Restroom Renovations / Additions Level Two • Used to help provide direction on proposed options. They are PRELIMINARY and not anticipated contractor bids • Order of magnitude only and based on $/sf and not specific design solutions / bid documents • Based on 2025 construction costs and recent/relevant/similar projects in STL metro • Does not include fixtures, furnishings, equipment, permitting or professional fees • Does not include property acquisition • Does not include renovation of swing space Cost Estimates Preliminary, pre-bid cost estimates including 20-35% contingency THE FAMILY CENTER Level 2 - Proposed Design 1 New Construction - sf $0 $0 Renovation 10,745 sf $100 $1,074,500 New Addition 4,974 sf $500 $2,487,000 Parking Lots and Drives 4,200 sy $95 $399,000 Green Space and Playground 1 ls $300,845 $300,845 Stay, Play and Learn Playground 1 ls $150,000 $150,000 Roofing - ls $0 $0 Exterior Lighting 1 ls $47,450 $47,450 Exterior Envelope 1 ls $212,050 $212,050 HVAC 1 ls $1,280,000 $1,280,000 Subtotal $5,950,845 Total w/GC Markups & Contingency 30 % $7,736,098 LEVEL 3 TOTAL DESCRIPTION QTY UNIT PRICE LEVEL 2 TOTAL Preliminary, pre-bid cost estimates includes contingency noted above and represents potential long-range projects Captain Elementary Top Priorities: Gym Addition Cafeteria/Kitchen Renovation 2nd Level Classroom Renov. Wellness Suite SSD Suite Turf Field Restroom Renovations Improve Accessibility Site Circulation Level Two
Captain Elementary Top Priorities: Gym Addition Cafeteria/Kitchen Renovation 2nd Level Classroom Renov. Wellness Suite SSD Suite Turf Field Restroom Renovations Improve Accessibility Site Circulation Level Two LEVEL 3 TOTAL DESCRIPTION QTY UNIT PRICE LEVEL 2 TOTAL Preliminary, pre-bid cost estimates includes contingency noted above and represents potential long-range projects CAPTAIN ELEMENTARY SCHOOL Level 2 - Proposed Design 1 Demo & Associated General Conditions 1 ls $1,000,000 $1,000,000 Renovation 30,278 sf $125 $3,784,750 New Addition - Gym and Music Room 8,303 sf $700 $5,812,100 New Addition - Classrooms and Entry 2,708 sf $500 $1,354,000 Turf Field 1 ls $250,000 $250,000 Greenspace, Playfield, and Playgrounds 1 ls $413,340 $413,340 Roofing 1 ls $728,436 $728,436 Exterior Lighting 1 ls $35,750 $35,750 Exterior Envelope 1 ls $91,547 $91,547 HVAC 1 ls $2,200,000 $2,200,000 Subtotal $15,669,923 Total w/GC Markups & Contingency 20 % $18,803,908 Glenridge Elementary Top Priorities: Gym Addition Relocate Ground Level Classrooms Administration Suite Renovation Wellness Suite SSD Suite Renovation Restroom Renovations Classroom Renovations Outdoor Learning and Activity Addition Parking & Site Circulation Improve Accessibility Facility-Wide Level Two • Fully maximizes each site • Little opportunity for future growth interior & exterior • Limited interior flexibility/adaptation • Most interior spaces would remain as-is, just renovated & refreshed • May need to revisit the long-term viability in 10 years if this approach is taken • Life of building resets on new additions, not entire structure
Glenridge Elementary Top Priorities: Gym Addition Relocate Ground Level Classrooms Administration Suite Renovation Wellness Suite SSD Suite Renovation Restroom Renovations Classroom Renovations Outdoor Learning and Activity Addition Parking & Site Circulation Improve Accessibility Facility-Wide Level Two • Fully maximizes each site • Little opportunity for future growth interior & exterior • Limited interior flexibility/adaptation • Most interior spaces would remain as-is, just renovated & refreshed • May need to revisit the long-term viability in 10 years if this approach is taken • Life of building resets on new additions, not entire structure LEVEL 3 TOTAL DESCRIPTION QTY UNIT PRICE LEVEL 2 TOTAL GLENRIDGE ELEMENTARY SCHOOL Level 2 - Proposed Design 1 Demo and General Conditions 1 ls $1,000,000 $1,000,000 Renovation 28,778 sf $125 $3,597,250 New Addition - Classrooms 10,400 sf $500 $5,200,000 New Addition - Gymnasium 10,223 sf $700 $7,156,100 New Addition - ADA Entries 1,376 sf $500 $688,000 Parking Lots and Drives 848 sy $22 $18,656 Greenspace 1 ls $50,000 $50,000 Roofing 1 ls $134,389 $134,389 Exterior Lighting 1 ls $58,850 $58,850 Exterior Envelope 1 ls $634,564 $634,564 HVAC 1 ls $2,220,000 $2,220,000 Subtotal $20,757,809 Total w/GC Markups & Contingency 30 % $26,985,152 Preliminary, pre-bid cost estimates includes contingency noted above and represents potential long-range projects
LEVEL 3 TOTAL DESCRIPTION QTY UNIT PRICE LEVEL 2 TOTAL GLENRIDGE ELEMENTARY SCHOOL Level 2 - Proposed Design 1 Demo and General Conditions 1 ls $1,000,000 $1,000,000 Renovation 28,778 sf $125 $3,597,250 New Addition - Classrooms 10,400 sf $500 $5,200,000 New Addition - Gymnasium 10,223 sf $700 $7,156,100 New Addition - ADA Entries 1,376 sf $500 $688,000 Parking Lots and Drives 848 sy $22 $18,656 Greenspace 1 ls $50,000 $50,000 Roofing 1 ls $134,389 $134,389 Exterior Lighting 1 ls $58,850 $58,850 Exterior Envelope 1 ls $634,564 $634,564 HVAC 1 ls $2,220,000 $2,220,000 Subtotal $20,757,809 Total w/GC Markups & Contingency 30 % $26,985,152 Preliminary, pre-bid cost estimates includes contingency noted above and represents potential long-range projects Glenridge Elementary Level One & Level Two Improvements Complete Renovation of Glenridge Demo & Rebuild Portions Rebuild Front Entries for ADA Relocate Parking Level Three • Allows for future growth & adaptation of interior learning environments • But fully maximizes each site; limited opportunity for future growth on exterior • Life of building resets on entire building • Very similar to what higher education has done to similar aged buildings • New school within existing shell to extend the life for decades