LRFMP Board Presentation Feb2025

This is a February 2025 board presentation from the School District of Clayton outlining a long-range facilities and master plan (LRFMP). It summarizes district enrollment trends, facility assessments, stakeholder engagement (steering and building-level committees, community forums, surveys), and proposed renovations/new construction at multiple sites (Family Center, Captain, Meramec, Wydown, Clayton HS, athletics at Gay Field) with preliminary Level 2 cost estimates and contingency percentages (examples: Family Center total w/ markups $7,736,098; Meramec Level 2 total w/ markups $26,873,970; Athletics Level 2 total w/ markups $23,235,422). The presentation projects borrowing capacity of up to $90M at the current $0.5110 debt levy (an early planning figure; the bond ultimately placed before voters in April 2026 was $135M), and notes the district spends about $4M annually on capital maintenance.
Cited passage

Combine 3 elementary schools into 2 new schools on new sites? Further exploration through a feasibility study is needed on the elementary schools and property acquisition may be required

Funding Current Debt = $34,752,000 to be fully paid off by March 1, 2029 Current Debt Levy = $0.5110 per $100 assessed valuation Will support up to $90M of bonds to fund capital projects without a tax increase

Long Range Facilities Master Plan Options Total potential future long-range projects at each site: Building

Level 2

Level 3 • The Family Center $8m

• Captain Elementary $19m

• Glenridge Elementary $27m

$44m • Meramec Elementary $27m

$44m • Wydown Middle School $4m • Clayton High School $29m • Athletics & Activities $23m

$30m Total Construction +/- $137m to $178m Three new elementary schools • New Captain Elementary

$43m • New Glenridge Elementary $43m • New Meramec Elementary $43m $129m Provided by Paragon Architecture • Order of Magnitude construction costs in 2025 dollars • Preliminary, pre-bid rounded estimates with contingency • Further exploration is needed on feasibility • Building construction costs only, does not include site design costs due to unknown site • Does not include FF&E or professional services • Does not include land acquisition • Does not include acquisition and renovation of swing space • Order of Magnitude construction costs in 2025 dollars • Preliminary, pre-bid rounded estimates with 20-35% contingency • Does not include FF&E or professional services • Does not include land acquisition • Does not include acquisition and renovation of swing space